Home
>
News
>
Events
>
CEDA 2005: Third generation rock cutting system; Safety and Economic improvements for dredge contractors
Home
Company
Products
News
Contact
Jobs
Intelligent equipment solutions for cost-effective dredging
Company history
TSHD Components
TSHD Systems
TSHD Packages
TSHD Complete
CSD/WSD Components
CSD/WSD Systems
CSD/WSD Packages
CSD/WSD Complete
Conversions & Refits
Auxiliary equipment
Engineering & Services
Special Design / R&D
Press releases
Technical papers
Events
Archive
Dragheads
Lower straight pipe
Turning gland
Double joints
Upper straight pipe
Single joints
Trunnion bend
Sliding piece
Dredge pumps
Bow couplings
Automation systems
Side suction systems
References
Overview standard
References
Cutter heads
Cutting teeth
Cutting wheels
Plain suction head
Ball joints
Click-in couplings
Swivel bends
Side wire blocks
Spuds
Coupling blocks
Ladder front pieces
Cutter ladders
Cutting wheels
Dredge pumps
Spud carriers
Anchor booms
References
Overview standard
References
References
S.W.C. Pontoons
Services
R&D
News
Events
WODCON XIX – Beijing, 8- 12 September 2010
WEDA 30 and TAMU 41 – San Juan, 6 - 9 June 2010
Maritime & Offshore Career event – Rotterdam, 28 April 2010
Asia Pacific Maritime – Singapore, 24- 26 March 2010
Europort 2009 – Rotterdam, 3- 6 November 2009
INMEX India – Mumbai, 24- 26 September 2009
CEDA Dredging Days – Rotterdam, 5-6 November 2009
M&T Expo – Sao Paulo, 2 - 6 June 2009
WEDA 29/ TAMU’s 40th Dredging – Tempe, 14 - 17 June 2009
Exponor – Antofagasta, 15 - 19 June 2009
NEVA 2009 (HME) – St. Petersburg, 22 - 25 September 2009
CEDA Dredging Days – Antwerp, 1 - 3 October 2008
PorTech Asia – Tianjin, 17 and 18 September 2008
Navalshore 2008 – Rio de Janeiro, 25 - 27 June 2008
WEDA XXVIII – St. Louis, 8- 11 June 2008
Career Event - Rotterdam, 16 April 2008
Asia Pacific Maritime – Singapore, 26 - 28 March 2008
CEDA Dredging Days – Rotterdam, 8-9 November 2007
Inmex India - Mumbai, 3-5 October 2007
CEDA 2003: Third Generation Rock Cutting Systems for Cutter Dredges with 3000-6000 kW Cutter Power
CEDA 2005: Third generation rock cutting system; Safety and Economic improvements for dredge contractors
CEDA 2005: Third generation rock cutting system; Safety and Economic improvements for dredge contractors
CEDA 2003: Third Generation Rock Cutting Systems for Cutter Dredges with 3000-6000 kW Cutter Power
CEDA 2005: Third generation rock cutting system; Safety and Economic improvements for dredge contractors
During the CEDA Dredging Days 2005, this paper about the 3rd generation cutting system aiming at the safety and economic improvements for dredge contractors, was presented.
Download:
CEDA2005-third generation cutting system-final.pdf
Top
Disclaimer
|
Add to Favorites
|
Site map